a. Water Supply Systems
EIS: more than six production wells and other systems (e.g. infiltration
gallery,)
IEE: six or less production wells
b. Water Supply System (Distribution Only) IEE:
Level III
c. Irrigation System (distribution system only)
EIS: >=1,000 hectares service area
IEE: < 1,000 hectares service area
CNC: < 300 hectares
d. Impounding System or Flood Control
EIS: Reservoir (flooded area) > = 25 hectares
IEE: Reservoir (flooded area) , 25 hectares
e. Pipelines
1. Fuel Pipelines
EIS: Length >=25 kilometers
IEE: Length < 25 kilometers
2. Other Pipelines
EIS: Length >= 50 km
IEE: Length < 50 km
Additional requirements to be attached to the EIS:
- Location map/Project site plotted on the Topo Map with 1:50,000
scale
- Site Development Plan/Map Noting adjacent water bodies (scale:
1:10,000)
2. Endorsement from the following LGU with resolution including
a copy of the documentation of the consultation process undertaken.
- Sangguniang Pambarangay
- Sangguniang Bayan/Panlungsod
- Sangguniang
Panlalawigan
- Free and Prior Informed Consent of IPs in case the
area falls within a certified ancestral land/domain.
3. Zoning Clearance
from the Municipality/City Zoning Office 4. Proof of land ownership,
land claim or land occupancy - Land Title/Tax Declaration/Stewardship
Contract/Other Instruments
- Certification/evaluation from CENRO/PENRO
|